PEOPLE'S GOVERNMENT OF JILIN PROVINCE
 
 
  ENGLISH >Exposition
 
 
Jiajiaying Second-Class Hydroelectric Power Station of Linjiang City
     
 

  I. Introductions of the Project

  (I) Construction Background of the Project: Jiajiaying Second-Class Hydroelectric Power Station is located in Linjiang City of Jilin Province. It is in the middle reaches of Sandaogou River, one of the branches of Yalujiang River. It is a project of water conservancy, which is mainly in charge of generating electricity.

  (II) Scale of Construction and Scheme of Products: The reservoir volume of Jiajiaying Second-Class Hydroelectric Power Station is 670,000m3. Its installed capacity is 2,500 kw. For many years, the average generated energy is 8,568,100 kw.h. Every year, 3,427 hours are used. Jiajiaying Second-Class Hydroelectric Power Station works in the form of water inletting. It is made up of three parts, including dams across the river, workshops and inletting systems. The total length of the dams across the river is 30 meters. The length of the biggest dam is 13.7 meters. The whole length of the tunnels for channelling water is 3,500 meters with a 3〜4 meters' section which is in the type of a gateway.

  (III) Forecasting of Economic Benefit: Economic Evaluation of Jiajiaying Second-Class Hydroelectric Power Station: The time limit of loans repayable is 8 years. The price of electricity for being on the Internet is 0.47 Yuan/kw.h. The interior profit rate of its financial affairs is 13.05%.

  (IV) The Total Investment in the Project: The total investment in the construction of Jiajiaying Second-Class Hydroelectric Power Station is RMB 21,262,100.00 Yuan.

  (V) Cooperation Manner: Single investment or joint venture

  (VI) Foreign Investment Demanded and Its Constitutions: Capitals and equipments

  (VII) Site of Construction: Linjiang City of Jilin Province

  (VIII) Progress of the Project: The research report of feasibility of the project has been ratified by Provincial Planning Committee with the No. [2000]853 Document of Jijinongzi and the preliminary design report has also been ratified by Water Conservancy Bureau of Jilin Province.

  II. General Situations of the Chinese Party

  (I) Name of the Enterprise: Project Office of Jiajiaying Second-Class Hydroelectric Power Station of Linjiang City

  Legal Address: Linjiang City of Jilin Province

  Legal Representative: Gong Minghuan

  (II) General Situation of the Enterprise: There are 128 working staffs in the Project Office of Jiajiaying Second-Class Hydroelectric Power Station of Linjiang City.

  (III) Contact Method:

  Postal Code: 134600

  Person to Contact: Liu Dengxiang

  Tel: 86-439-5212543

  Mobile Phone: 13804496789

 
     
 
 
 
 
PEOPLE'S GOVERNMENT OF JILIN PROVINCE
 
Copyright(c)2005 People's Government of Jilin Province, All Rights Reserved